Interested in a simple Skills Scan and Learning Progress Tracker tool for the Automation and controls engineering technician standard?
Knowledge
K1: Engineering maths - mathematical principles and theories that underpin engineering
K2: Engineering principles - the underlying principles of electrical and electronic circuits and devices
K3: Functional solutions - Create functional solutions; identifying and justifying a solution to a given engineering need
K4: Safety procedures - relevant safety procedures required to operate on automation equipment in an industrial environment
K5: Single and three phase circuits - single phase and three phase supplies on AC and DC motor and control circuits
K6: Automation knowledge - Programmable Logic Controllers (PLC), Variable Speed Drives (VSD), Human Machine Interface (HMI) & Supervisory Control and Data Acquisition (SCADA), robotics hardware and software tools to carry out configuration, programming and fault finding duties
K7: Instrumentation knowledge - instrumentation used to measure flow, temperature, pressure etc and the means by which they transmit measurement data
K8: Use of software tools - Justification in the utilisation of software tools would be for but not limited to the changing of hardware configurations, firmware updates, software modifications and commissioning
K9: Industrial networking knowledge - the application, installation and operational characteristics of industrial communication networks at Supervisory (e.g. Ethernet), Cell (e.g. PROFINET/PROFIBUS) and Field (e.g. AS-Interface) levels
K10: Use of diagnostic tools - diagnostic tools and equipment including web-based diagnostics incorporated into network devices and other software tools (e.g. PROFITrace)
K11: Understand technical documents - Ability to follow electrical system circuit diagrams, understand the operation of the various components that make up an automation system
K12: Safety legislation and responsibilities - electrical safety system legislation & directives
K13: Quality systems - quality assurance principles to ensure operation, consistency and quantification of enhancement of manufacturing and process applications
Skills
S1: Safety Effective - The ability to work safely in an industrial environment and where required, produce risk assessment/method statement documentation. Be able to apply the principles of functional machinery and/or process safety including SIL (Safety Integrated Level) and PL (Performance Level) terminology
S2: Engineering documentation - Production and interpretation of a range of technical documentation (device manuals, operating procedures, schematics, fault reports etc), and working with company documentation systems
S3: Project engineering capabilities - Support of installation, commissioning, shut-down, start-up and maintenance/service/support of a wide range of systems and devices
S4: Diagnostic capabilities - Fault finding, diagnosis, rectification and reporting of automation control systems and controls applications via the utilisation of formal problem solving methods and diagnostic tools/software
S5: Instrumentation configuration and calibration - Set-up, calibrate and commission a wide variety of field level instrumentation that interfaces to automation & control systems
S6: Industrial Networks configuration and support - configure, assist commissioning and continued support of industrial network solutions at all hierarchical levels of control system integration using the requisite tools and or software
S7: HMI & SCADA configuration and programming - Make changes to existing systems or implement new configurations
S8: PLC/Robot configuration and programming - Implement complex PLC/Robot program content and configurations to affect changes to increase availability and or efficiency of automation controlled machinery and the ability to configure PLC and or Robot hardware and program a wide variety of PLC’s and or Robot’s
Behaviours
B1: Zero Harm - Always prioritise on Health and Safety best practice
B2: Resilience - Sound and established ability to work effectively both in a team and alone
B3: Personal excellence - Interact professionally with clients and stakeholders
B4: Communicative - High quality communication skills
B5: Ethical - Strong professional and business ethics
B6: Commitment - A focus on quality in all the tasks assigned
B7: Continual development - Willingness to learn new processes, methods and technologies
B8: Responsibility - Strong commitment and accountability and ability to apply independent judgement
B9: Personal Values - Respect and tolerance of others
B10: Ambassadorial - To be a role model of engineering practice and to promote engineering in order to sustain a pipeline of future talent
B11: Reflection - Evaluate outcomes of own performance across all duties
Duty 1
DUTY: Setup of a wide range of hardware and software found on industrial networks and control systems including, but not limited to PLC's, Robots, Human Machine Interfaces (HMIs), Supervisory Control and Data Acquisition (SCADA) systems, variable speed drives, soft-starters, energy monitoring equipment, instrumentation, safety systems and servo drives
CRITERIA FOR MEASURING PERFORMANCE: The set-up duty is concerned with the preparation of devices either on the control system itself or devices such as laptops on which programming and set-up tools will be deployed. This duty can take place during commissioning or as a result of making a change or replacing devices of an existing operational system.Criteria for measurement: -Software installed on PCs correctly, using the right version of the software for the hardware being configured.Hardware settings correctly applied to devices to meet specifications of the job.Systems made operational after changes or updates including configuration / re-configuration via software tools All safety standards met or exceededDevices set up correctly using manufacturers technical information.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B5
B6
B7
B8
B9
B11
Duty 2
DUTY: Program a wide range of hardware using a range of software tools on control systems including, but not limited to PLC's, Robots, Human Machine Interfaces (HMIs), Supervisory Control and Data Acquisition (SCADA) systems, variable speed drives, soft-starters, energy monitoring equipment, instrumentation, safety systems and servo drives
CRITERIA FOR MEASURING PERFORMANCE: This duty is normally carried out prior to installation of a control system but will also be deployed during factory acceptance testing, during commissioning and post operation optimization. Criteria for measurement: -Devices are correctly parameterized according to required functionality and purpose.Effective software solutions (programs) are implemented and correct functionality is achieved.All safety standards met or exceededThe customer's requirement for functionality is understood and delivered in line with expectations
K1
K2
K3
K4
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 3
DUTY: Commission a wide range of hardware and/or software found in industrial networks and control systems including, but not limited to PLC's, Robots, Human Machine Interfaces (HMIs), Supervisory Control and Data Acquisition (SCADA) systems, variable speed drives, soft-starters, energy monitoring equipment, instrumentation, safety systems and servo drives
CRITERIA FOR MEASURING PERFORMANCE: Commissioning is the pre-operation phase of testing of functionality prior to systems being released for full operational requirements. Criteria for measurement: -All wired electrical systems are connected correctlySafe power-up checks are implemented in compliance with method statementsCorrect functionality of device performance measures up to functional requirementsAll safety standards met or exceededUse and understanding of a wide range of supporting documentation including electrical schematic diagrams, Functional Design Specification (FDS) or User Requirement Specification (URS), manufacturers data sheets and operation manuals to ensure correct functionality is delivered in line with requirements.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 4
DUTY: Service a wide range of hardware found on today’s industrial networks and control systems including, but not limited to PLC's, Robots, Human Machine Interfaces (HMIs), Supervisory Control and Data Acquisition (SCADA) systems, variable speed drives, soft-starters, energy monitoring equipment, instrumentation, safety systems and servo drives
CRITERIA FOR MEASURING PERFORMANCE: is proactive activity would take place over the operational lifecycle of a control system.Criteria for measurement: -Latest firmware upgrades are downloaded into existing devicesAscertain effectiveness of hardware performance against required functionality.Interpret and use manufacturers guidelines to aid service requirements of devices.All safety standards met or exceededDocumentation updated indicating that servicing has taken place.
K1
K2
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 5
DUTY: Maintain a wide range of hardware and software found on today’s industrial networks and control systems including, but not limited to PLC's, Robots, Human Machine Interfaces (HMIs), Supervisory Control and Data Acquisition (SCADA) systems, variable speed drives, soft-starters, energy monitoring equipment, instrumentation, safety systems and servo drives
CRITERIA FOR MEASURING PERFORMANCE: his proactive activity would take place over the operational lifecycle of a control system.Criteria for measurement: -Latest firmware upgrades downloaded into existing devicesRelevant versions of software configuration tools on computers/laptops are maintained.Effectiveness of hardware performance against required functionality ascertained.Interpret and use manufacturers guidelines to aid maintenance requirements of devices.All safety standards met or exceededDocumentation updated indicating that maintenance has taken place
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 6
DUTY: Develop or modify automation and control system programs using a variety of different programing tools, languages and techniques
CRITERIA FOR MEASURING PERFORMANCE: This activity would take place primarily at the beginning of a project but would also be utilised during testing & commissioning and during the operational lifecycle of the automation system for optimisation and additional functional requirements.Criteria for measurement: -Program functionality in the required language (e.g. ladder logic), to a given specification or requirements.Understand and explain existing software solutions written in languages (e.g. ladder logic).Plan software solutions prior to development.Accurate and clear supporting documentation of the program is provided.All safety standards met or exceeded.Documentation/operator manuals are updated reflecting any changes made to existing systems.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 7
DUTY: Test and validate automation & control systems to ensure that they are safe, functional and satisfy the requirements of a system specification, complying with national and/or international standards
CRITERIA FOR MEASURING PERFORMANCE: This activity would take place during commissioning and over the operational lifecycle of a control system.Criteria for measurement: -Manufacturers or system specific operational information used to gauge existing performance against required performance.Processes for recording test & validation activities are updated and maintained.All safety standards met or exceeded.Appropriate national/international standards have been complied with.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 8
DUTY: Support and maintain the integration of electrical/electronic safety devices within an automation & control system
CRITERIA FOR MEASURING PERFORMANCE: This activity would take place over the operational lifecycle of a control system.Criteria for measurement: -Safety devices specified for the function and their suitability is understood.Effective lock-off and safe isolation procedures carried out.Manufacturers product information with regards installation, operation and replacement are understood and applied.Risk assessments for electrical safety circuits are understood and applied.Terminology and relevance of safety levels (e.g. SIL 3 or PLe) are understood
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 9
DUTY: Install, support and maintain devices linked to and across Industrial Networking infrastructures including configuration and programming duties to ensure that the flow of data across these devices is maintained
CRITERIA FOR MEASURING PERFORMANCE: This activity would take place over the operational lifecycle of a control system.Criteria for measurement: -Firmware on all devices are kept up to date in line with manufacturer recommendations and available updates.Appropriate network topologies are installed and maintained.Appropriate software configurations and program solutions are implementedSituations where updating firmware should not be carried out are identified.All safety standards met or exceededDocumentation that requires change subject to update activities are maintained.Back-ups of previous configurations are implemented.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B6
B7
B8
B9
B11
Duty 10
DUTY: Provide effective fault escalation support to first line service personnel that lead to successful return to operation of automation & control systems
CRITERIA FOR MEASURING PERFORMANCE: This reactive activity would take place over the operational lifecycle of a control system.Criteria for measurement: -Information about a faulty situation is obtained and used to provide a suitable solution.Communicate effectively with all stakeholders.All safety standards met or exceeded, Safety of others is ensured during start/re-start of a system.Technical information from sources such as operator manuals, electrical schematics, software configurations is understood and applied.Other resources such as manufacturer technical support facilities used effectively.
K1
K2
K3
K4
K5
K6
K7
K8
K9
K10
K11
K12
K13
S1
S2
S3
S4
S5
S6
S7
S8
B1
B2
B3
B4
B5
B6
B7
B8
B9
B11
Duty 11
DUTY: Supervise/manage/oversee activities such as installation of automation & control equipment and industrial networks
CRITERIA FOR MEASURING PERFORMANCE: This activity would take place during the installation lifecycle of a control system.Criteria for measurement: -Technical information such as electrical schematics, wiring schedules are understood and appliedA safe working environment is maintained.Manufacturers product guidelines regarding installation of equipment are understood and applied.Effective communication with all installation parties is maintained in order to escalate/resolve issues.
K1
K2
K3
K4
K5
K6
K7
K9
K11
K12
K13
S1
S2
S3
S5
S6
S7
S8
B1
B2
B3
B4
B5
B6
B7
B8
B9
B11
Duty 12
DUTY: Upkeep and maintenance of own knowledge of by actively engaging in a program of CPD for example to keep abreast of changes to legislation, standards (e.g. quality), state of technology
CRITERIA FOR MEASURING PERFORMANCE: Criteria for measurement: -Appropriate seminars, exhibitions and training courses are attendedEngaged in promoting engineering activities such as careers fairsParticipated in skills competitions (e.g. World Skills)
K6
K7
K9
K12
K13
S2
S3
B1
B2
B3
B5
B6
B7
B8
B9
B10
B11
Duty 13
DUTY: Apply relevant safety legislation, and any extra company requirements when working with industrial networking, automation & control systems
CRITERIA FOR MEASURING PERFORMANCE: urses and site inductions.Criteria for measurement: -Relevant safety legislation is appliedEffective risk assessment is carried out prior to work activities.All safety standards met or exceededSafe working environment is maintained.
K3
K4
K6
K7
K11
K12
K13
S1
S2
S3
S5
S6
S7
S8
B1
B2
B3
B4
B5
B6
B7
B8
B9
B11
Duty 14
DUTY: Carry out effective risk assessments when undertaking engineering activities on automation systems
CRITERIA FOR MEASURING PERFORMANCE: The duty will usually be carried out prior to undertaking work activities that may be proactive (e.g. commissioning) or reactive in nature (e.g.fault finding). Criteria for measurement: -Appropriate hazard identification .Appropriate risks identified and reduced.Probability of occurrence identified and if necessary, reduced.A risk assessment document is produced